These are fixed teaching scenarios—not live agents or production evidence. Select a scenario and stage to inspect the record, owner, evidence, and stop conditions.
07 / 11 · failed
Independent verification
The exact candidate is challenged outside the producing session.
Architectural lesson
Completion is not acceptance.
Completed
Execution produced a candidate and complete run record.
Failed
The behavioral quality contract scored 8/10 against a required 9/10.
Decision owner
Human / policy authority—not the producing agent or harness.
Delivery
Blocked because the evidence package is ineligible for acceptance.
Recovery
Preserve the failed evidence, revise the candidate or specification, create a new attempt, and verify again.
Who determines whether the completed candidate satisfies the required acceptance evidence?
Concept boundaries
Understand the system by contrast.
Choose a pair, then increase the depth. Each comparison states ownership, limits, and the authoritative chapters without creating a second source of truth.
AI Software Factory→Agent Factory ↔ AI Software Factory
Core distinction
The Agent Factory supplies governed capabilities. The AI Software Factory composes them into governed delivery outcomes.
How to use the map
Start broad. End at the contract.
01
Choose a view
Use lifecycle for sequence, planes for ownership, components for runtime, or monitoring for failure response.
02
Apply a lens
Focus on authority, runtime, assurance, or operations without losing the complete system context.
03
Inspect the card
Every item names responsibility, owner, contract, risk, and required proof in text.
04
Walk the run
Use the deterministic scenario to see which record, owner, evidence, and stop condition governs every transition.
05
Compare the boundary
Use the contrast guide to separate adjacent concepts before opening their authoritative chapters.
06
Open the source
The linked Markdown chapter is canonical and carries failure, recovery, versioning, exercises, and evidence boundaries.
Architecture is not proof
Review the design. Exercise the controls. Keep the claim scoped.
The map is review ready. It does not assert that every component, control, SLO, or recovery path is operationally proven.